All systems that are part of the North American bulk electrical system (BES) must be NERC compliant. NERC PRC compliance pertains to any system that contains protection and controls.
Our power system engineers have the expertise and training to conduct full NERC compliance studies and provide recommendations if non-compliance is indicated.
Standard | Title | Effective Date |
PRC-019-2 | Coordination of Generator Unit or Plant Capabilities, Voltage Regulating Controls, and Protection | 07/01/2016 |
PRC-024-2 | Generator Frequency and Voltage Protective Relay Settings | 07/1/2018 |
PRC-025-2 | Generator Relay Loadability | 01/01/2018 |
PRC-026-1 | Relay Performance During Stable Power Swings | 10/01/2014 |
PRC-027-1 | Coordination of Protection Systems for Performance During Faults | 04/01/2021 |